BAITUMAL MAKMUR II

Surface preparation

Saw cut groove before install strengthening work

Saw cut groove work done

Vacuum the groove to make sure there are no loose particles

Plate need to be clean and free from grease and any contanimants.

Plate installation with adhesive epoxy mortar

Finish installation and let the substrate dry.

Sand sparkling before patch with the mortar

Saw cut groov e filled up with grout

Strengthening work done

Looking for a First-Class Business Plan Consultant?