PROJECT: IBRACO, SOHO, WATER BAR INSTALLATION MATERIALS: MAPEI IDROSTOP CJ20
Installation and positioning of waterbar at half thickness of concrete wall and stretch to straight line. Then, joining the waterbar using PVC welding iron.
Looking for a First-Class Construction Work Specialist?